Delay Factors of Construction Projects in Oman
Main Article Content
Abstract
The construction industry is the second largest economic sector of the Sultanate of Oman. The construction industry plays important role in infrastructural development both for the public and private sectors. The delays in construction projects impact directly the economic development of the country. The present study aimed to analyze the delays in a construction project by conducting a survey based on a questionnaire. The questionnaire survey is answered by 74 respondents and the quantitative data is further subjected to statistical analysis. The results are further tested through the Pearson chi-square test of independence and Cramer’s V tests. The results show that several factors contribute to the project delays in Oman including cultural differences, design changes, poor project management, and changes in project scope at the time of project execution. The managerial issues involved payment delays to contractors and authoritarian delays. The clients faced poor planning and execution of the project by the contractor and sub-contracting of the critical project phases.

Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Al Alawi, M. (2021). Delay in payment effects on productivity of small and medium construction companies in Oman: exploration and ranking. Asian Journal of Civil Engineering, 22(7), 1347-1359.
Al Amri, T., & Marey-Perez, M. (2020). Key quality issues affecting the sustainability of construction projects in Oman. International Journal of Advanced Science and Technology, 29(3), 4330-4338.
Al Amri, T., & Marey-Perez, M. (2021). Project delays and cost overruns between public and private sectors in Oman. Journal of Public Affairs, 21(3), e2262.
Al Maamari, A., & Khan, F. (2021). Evaluating the Causes and Impact of Change Orders on Construction Projects Performance in Oman. International Journal of Research in Entrepreneurship & Business Studies, 2(1), 41-50.
Al Sulaimani, S. H. K., & Yahia, H. (2021). Evaluating the impact of change orders on construction projects in Oman. Journal of Student Research.
Amri, T., & Marey-Perez, M. (2020). Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management, 5(2), 87-102.
Cramer, Harald. 1946. Mathematical Methods of Statistics. Princeton: Princeton University Press, page 282 (Chapter 21. The two-dimensional case). ISBN 0-691-08004-6 (table of content Archived 2016-08-16 at the Wayback Machine)
Umar, A. A., Al Rizeiqi, R. K., & Badr, A. (2020). Major Causes Assessment of Construction Delays. Journal of Engineering, Project & Production Management, 10(3).
Umar, T. (2018). Causes of delay in construction projects in Oman. Middle East Journal of Management, 5(2), 121-136.
Al Saadi, A. M. D., & Rahman, I. A. (2019). Identification of delay factor in Oman construction industry. International Journal of Sustainable Construction Engineering and Technology, 10(1).
Oyegoke, A. S., & Al Kiyumi, N. (2017). The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction.
Alnuaimi, A. S., & Mohsin, M. (2013, December). Causes of delay in completion of construction projects in Oman. In International Conference on Innovations in Engineering and Technology (pp. 267-270).
Albogamy, A., Scott, D., & Dawood, N. (2012). Addressing construction delays in the Kingdom of Saudi Arabia. International Proceedings of Economics Development & Research, 45, 148-153.
Al-Emad, N., Rahman, I. A., Nagapan, S., & Gamil, Y. (2017). Ranking of delay factors for Makkah's construction industry. In MATEC Web of Conferences (Vol. 103, p. 03001). EDP Sciences.
Elawi, G. S. A., Algahtany, M., & Kashiwagi, D. (2016). Owners' perspective of factors contributing to project delay: case studies of road and bridge projects in Saudi Arabia. Procedia Engineering, 145, 1402-1409.
Gobana, A. B., & Thakur, A. S. (2017). Critical review on causes and effects of variation order on construction project. Critical Review, 4(12), 1602-1606.
Wahyuni, D. (2012). The research design maze: Understanding paradigms, cases, methods and methodologies. Journal of Applied Management Accounting Research, 10(1), 69-80.
Scheurich, J. (2014). Research method in the postmodern. Routledge.
Haddadi, A., Hosseini, A., Johansen, A., & Olsson, N. (2017). Pursuing Value Creation in Construction by Research-A Study of Applied Research Methodologies. Procedia computer science, 121, 1080-1087.
Scotland, J. (2012). Exploring the philosophical underpinnings of research: Relating ontology and epistemology to the methodology and methods of the scientific, interpretive, and critical research paradigms. English Language Teaching, 5(9), 9-16.
Hamad, R. J., Tayeh, B. A., & Al Aisri, H. A. (2021). Critical Factors Affecting the Success of Construction Projects in Oman. Journal of Sustainable Architecture and Civil Engineering, 29(2), 121-138.
Albogamy, A., Scott, D., & Dawood, N. (2012). Addressing construction delays in the Kingdom of Saudi Arabia. International Proceedings of Economics Development & Research, 45, 148-153.
Alamri, N., Amoudi, O., & Njie, G. (2017). Analysis of construction delay causes in dams projects in Oman. European Journal of Business and Social Sciences, 6(2), pp.19-42