[1]
Biru, A. and Yahya, A. 2022. Feasibility study of Haffa Mini- hydropower plant in Bambasi Woreda. Technium: Romanian Journal of Applied Sciences and Technology. 4, 4 (May 2022), 50–74. DOI:https://doi.org/10.47577/technium.v4i4.6409.